SFU Westerly Feed Watermain

Project Highlights
The project included design and construction services for approximately 2 km of 300 mm diameter high pressure watermain from the Burnaby Mountain Pump Station to the Tower Road main at SFU. Piping materials included ductile iron and C900 PVC. Design challenges included several creek crossings, construction adjacent to a high voltage overhead power line, and a wet tap connection to an existing transmission main.